Showing posts with label foundation. Show all posts
Showing posts with label foundation. Show all posts

Wednesday, July 04, 2007

First we locked up the sill plates
so we cold mark where the cement guys placed the bolts
Posted by Picasa
Posted by Picasa
Siils ready to square up and bolt down
Posted by Picasa
Posted by Picasa
Back filled and ready for woodPosted by Picasa

Thursday, June 28, 2007

Well this brings an end to the cement portion of the show.
were just waiting for an inspection
and then we can backfill the hole and get nailin'

we ordered a pre-cast concrete stair and bulkhead door
from a company Woodards
Great quality and a speedy install
were happ and our foundation didnt go over budget
View from the basement
Posted by Picasa
Viola!
Posted by Picasa
The unit gets bolted on
and he starts to assemble the bulkhead doors
Posted by Picasa
2nd they mark four holes aand drill thru
Posted by Picasa
1st they lower the stairs in position
Posted by Picasa
Today our bulkhead staircase and basement doors were installed
Posted by Picasa

Wednesday, June 27, 2007

Well it Wed and we have a Floor!!! Jay, Angel,Molly, and Frankie are here from Philly fr a few days to help and even though we cant do much except watch cement dry were havin alot of fun .
Posted by Picasa
Posted by Picasa
After an hour or two its dry enough to walk on and this machine smooths everything out.
Posted by Picasa
Smoothing out the floor
Posted by Picasa
Posted by Picasa
This is the manifold all the red hoses go into. Using a bike pump we filled the line with air and made sure it held the pressure.If it holds the air with out leaking ,that means it will hold the water when we use it for heat. Its been pressurized for 24 hours and is looking good . They put the cement right up to the box. If they were to rupture the lines while spreading the cement the pressure would drop and air would bubble up out of the cement revealing the leak.

Luckily that did not happen. And now we have a radiant heat system in our concrete floor.
Those hoses will be filed with hot water via a water heater and the floor will warm accordingly.
Posted by Picasa
good thing they wore boots
Posted by Picasa
Wrapped in foam and ready to pour the floor
Posted by Picasa