Wednesday, September 03, 2008

Friday, August 15, 2008


new stove

goodbye hotplate
Posted by Picasa

Monday, August 11, 2008


And now back to the bird's nest
where we pick up on the parging event

first we glued the pink foam above on to the foundation



then we applied a coat of stucco
over which we embedded mesh and another coat of the gray




over that we started to apply the topcoat which will match our trim
Posted by Picasa

Sunday, August 10, 2008



heres something you dont get to do everyday


you put the ladder in the bucket

and you drink it all up
Posted by Picasa

We painted some ply wood for the living room floor
dark dark blue with some lighter squares
it's a subtle tribute to Ad Reinhardt


Posted by Picasa
Posted by Picasa

Monday, August 04, 2008


Posted by Picasa

working on the floors


Ulster county fair
Posted by Picasa

Wednesday, July 23, 2008



UNcle greg came up and we built a temp stair case out back
Posted by Picasa
Posted by Picasa

Building a temporary entry way


Its hot and and now marty wants to strangle me
Posted by Picasa

]Getting ready to put in newel post



Newel and railing
Posted by Picasa
IT"S BEDLAM

quick up date

electric is DONE!!!
we had a walk thruand at first all was good
then right at the end they told us we have to foam
and parge the foundation

PARGE???
Something else to learn
parge ?
it doesnt sound like its going to be fun

we basically have to stucco all the exposed foundaton

YEAHH!!!

Other than that all seems to be on track for moving in Sept 1st

Sunday, July 06, 2008





Django's Class Picture
Posted by Picasa


Heres the septic approval from the Board of Health
This is for all the doubters
who told us we couldnt get it

If you look closely they use the word maybe
in describing wheter its sufficient
Its like Bueracratic Mad Libs

Board of Idiots is more like it
Posted by Picasa
Hi Everybody

So much has happened in the las few weeks

Dick completed the septic field
which wasnt with out its own drama

When the Board of Health came to the site to inspect the work
the drawings they had from the engineer were different from the ones we built off of
meaning the engineer sent us drawings then later revised them and sent them to the B of H
and not to us.
Luckily oly a small change had to be made
ANd then last Thusday we recieved th approvala from the Bof H
This was huge
We were really excited
All during he 2 years we waited before we built was because we didnt think we could do something that would eventuallly be approved.
And then after all that they build it wrong.

Oh brother
anyway thats all in the past
so come on over and use our toilet

Martin was here for a few days and we built a wall in the basement and put up the railing
Were trying to resolve all the safety issues like stairs and handrails

So all seems on track for us to move in Sept 1st
Yeahhh!



Django loves his bedroom



Posted by Picasa