Here the cement board is down and those three pieces on the floor are the slate tiles were using
and now the tubing
Wednesday, September 12, 2007
We laid the floor like the first floor A series of 2 x 6's with a 3/4" spacer every other . than i routed ot the returns. I routed a 1/4" notch in the joist for the tube
We installed the recessed floor for the upstairs master bath
We dropped it down 7/8" so after we instal the radiant, cement board, and tile it will be flush with the other floor
Say hi to Nadya She's going to be helping out for the next few months